RIVO-Noord Zorgviewer Implementation Guide
1.26.0 - master
RIVO-Noord Zorgviewer Implementation Guide - Local Development build (v1.26.0) built by the FHIR (HL7® FHIR® Standard) Build Tools. See the Directory of published versions
| Official URL: http://fhir.hl7.nl/zorgviewer/ValueSet/ProcedureStatus | Version: 1.26.0 | |||
| Active as of 2026-09-21 | Computable Name: ProcedureStatus | |||
Deze waardelijst bevat de Zorgviewer weergavelabels voor de status van (geplande) verrichtingen en zorgactiviteiten (request-status, event-status en care-plan-activity-status)
References
This value set is not used here; it may be used elsewhere (e.g. specifications and/or implementations that use this content)
Profile: Shareable ValueSet
This value set includes codes based on the following rules:
http://hl7.org/fhir/request-status version 📦3.0.2| Code | Display | Definition |
| draft | Aangevraagd | The request has been created but is not yet complete or ready for action |
| active | Actueel | The request is ready to be acted upon |
| on-hold | Opgeschort | |
| suspended | Opgeschort | The authorization/request to act has been temporarily withdrawn but is expected to resume in the future |
| revoked | Geannuleerd | |
| cancelled | Geannuleerd | The authorization/request to act has been terminated prior to the full completion of the intended actions. No further activity should occur. |
| completed | Voltooid | Activity against the request has been sufficiently completed to the satisfaction of the requester |
| entered-in-error | Foutieve invoer | This electronic record should never have existed, though it is possible that real-world decisions were based on it. (If real-world activity has occurred, the status should be "cancelled" rather than "entered-in-error".) |
| unknown | Onbekend | The authoring system does not know which of the status values currently applies for this request. Note: This concept is not to be used for "other" . One of the listed statuses is presumed to apply, but the system creating the request doesn't know. |
http://hl7.org/fhir/event-status version 📦3.0.2
| Code | Display | Definition |
| preparation | In voorbereiding | The core event has not started yet, but some staging activities have begun (e.g. surgical suite preparation). Preparation stages may be tracked for billing purposes. |
| in-progress | Actueel | The event is currently occurring |
| not-done | Niet uitgevoerd | |
| on-hold | Opgeschort | |
| suspended | Opgeschort | The event has been temporarily stopped but is expected to resume in the future |
| stopped | Gestopt | |
| aborted | Afgebroken | The event was prior to the full completion of the intended actions |
| completed | Voltooid | The event has now concluded |
| entered-in-error | Foutieve invoer | This electronic record should never have existed, though it is possible that real-world decisions were based on it. (If real-world activity has occurred, the status should be "cancelled" rather than "entered-in-error".) |
| unknown | Onbekend | The authoring system does not know which of the status values currently applies for this request. Note: This concept is not to be used for "other" - one of the listed statuses is presumed to apply, it's just not known which one. |
http://hl7.org/fhir/care-plan-activity-status version 📦3.0.2
| Code | Display | Definition |
| not-started | Gepland | Activity is planned but no action has yet been taken. |
| scheduled | Gepland | Appointment or other booking has occurred but activity has not yet begun. |
| in-progress | Actueel | Activity has been started but is not yet complete. |
| on-hold | Opgeschort | Activity was started but has temporarily ceased with an expectation of resumption at a future time. |
| completed | Voltooid | The activities have been completed (more or less) as planned. |
| cancelled | Geannuleerd | The activities have been ended prior to completion (perhaps even before they were started). |
| stopped | Gestopt | |
| unknown | Onbekend | The authoring system doesn't know the current state of the activity. |
Expansion performed internally based on:
This value set contains 21 concepts
| System | Code | Display (en) | Definition | JSON | XML |
http://hl7.org/fhir/request-status | draft | Aangevraagd | The request has been created but is not yet complete or ready for action | ||
http://hl7.org/fhir/request-status | active | Actueel | The request is ready to be acted upon | ||
http://hl7.org/fhir/request-status | suspended | Opgeschort | The authorization/request to act has been temporarily withdrawn but is expected to resume in the future | ||
http://hl7.org/fhir/request-status | cancelled | Geannuleerd | The authorization/request to act has been terminated prior to the full completion of the intended actions. No further activity should occur. | ||
http://hl7.org/fhir/request-status | completed | Voltooid | Activity against the request has been sufficiently completed to the satisfaction of the requester | ||
http://hl7.org/fhir/request-status | entered-in-error | Foutieve invoer | This electronic record should never have existed, though it is possible that real-world decisions were based on it. (If real-world activity has occurred, the status should be "cancelled" rather than "entered-in-error".) | ||
http://hl7.org/fhir/request-status | unknown | Onbekend | The authoring system does not know which of the status values currently applies for this request. Note: This concept is not to be used for "other" . One of the listed statuses is presumed to apply, but the system creating the request doesn't know. | ||
http://hl7.org/fhir/event-status | preparation | In voorbereiding | The core event has not started yet, but some staging activities have begun (e.g. surgical suite preparation). Preparation stages may be tracked for billing purposes. | ||
http://hl7.org/fhir/event-status | in-progress | Actueel | The event is currently occurring | ||
http://hl7.org/fhir/event-status | suspended | Opgeschort | The event has been temporarily stopped but is expected to resume in the future | ||
http://hl7.org/fhir/event-status | aborted | Afgebroken | The event was prior to the full completion of the intended actions | ||
http://hl7.org/fhir/event-status | completed | Voltooid | The event has now concluded | ||
http://hl7.org/fhir/event-status | entered-in-error | Foutieve invoer | This electronic record should never have existed, though it is possible that real-world decisions were based on it. (If real-world activity has occurred, the status should be "cancelled" rather than "entered-in-error".) | ||
http://hl7.org/fhir/event-status | unknown | Onbekend | The authoring system does not know which of the status values currently applies for this request. Note: This concept is not to be used for "other" - one of the listed statuses is presumed to apply, it's just not known which one. | ||
http://hl7.org/fhir/care-plan-activity-status | not-started | Gepland | Activity is planned but no action has yet been taken. | ||
http://hl7.org/fhir/care-plan-activity-status | scheduled | Gepland | Appointment or other booking has occurred but activity has not yet begun. | ||
http://hl7.org/fhir/care-plan-activity-status | in-progress | Actueel | Activity has been started but is not yet complete. | ||
http://hl7.org/fhir/care-plan-activity-status | on-hold | Opgeschort | Activity was started but has temporarily ceased with an expectation of resumption at a future time. | ||
http://hl7.org/fhir/care-plan-activity-status | completed | Voltooid | The activities have been completed (more or less) as planned. | ||
http://hl7.org/fhir/care-plan-activity-status | cancelled | Geannuleerd | The activities have been ended prior to completion (perhaps even before they were started). | ||
http://hl7.org/fhir/care-plan-activity-status | unknown | Onbekend | The authoring system doesn't know the current state of the activity. |
Explanation of the columns that may appear on this page:
| Level | A few code lists that FHIR defines are hierarchical - each code is assigned a level. In this scheme, some codes are under other codes, and imply that the code they are under also applies |
| System | The source of the definition of the code (when the value set draws in codes defined elsewhere) |
| Code | The code (used as the code in the resource instance) |
| Display | The display (used in the display element of a Coding). If there is no display, implementers should not simply display the code, but map the concept into their application |
| Definition | An explanation of the meaning of the concept |
| Comments | Additional notes about how to use the code |